A supplemental calculation for evaluating Rated B16.5 and B16.47 Flanges to various methods such as those proposed by UG-44(b), Koves and Kellogg has been added.
The nozzle reports can now show compliance with UG-44(a) in the nozzle summary and the nozzle neck calculations part of the report. This can be done using the new “Reference UG-44(a) with UG-45” check box on the Nozzle General Info form.
ASME Section VIII Div 1 2021 code changes are now available in the software.
The Tubesheet Shear Calculation window has been updated per the 2021 Edition of ASME Section VIII Div 1 to consider yield strength in determining if the shear stress needs to be calculated for the tubesheet.
Tube to Tubesheet weld configurations have been updated to support new options in the 2021 Edition.
⇒ To see how this works in the software, visit Tubesheet - Tube to TS Joints.
The following materials have been added to the Table UHA-23 for 2021:
The following materials have been added to the Table UNF-23.4 for 2021:
SB-265 R54250
SB-338 R54250
SB-348 R54250
SB-363 R54250
SB-367 R54250
SB-381 R54250
SB-861 R54250
SB-862 R54250